The replacement teak has faded beautifully, the sanded areas look great and there are some hatches round the front and the main engine hatch. These needed to be built up to allow a cover to sit on top and for water to run off.
Brief posts as a Rye trip means about four hours of horrid London-motorway-hairpin bends driving and I am SHATTERED!
Lots of the pelleting on the deck has been done and very excitingly Ian the carpenter has tidied up the shipping container. I even hear there is now a toastie maker in there!